Ahvaz Project   <

Three long buildings housing the whisky production facilities are situated at the north side of the site; parallel in formation, they are tucked into the natural gentle slope of the land with gradually descending rooflines. In an interpretation of vernacular architecture, reclaimed clay tiles give a humble texture to the pitched roofs that rest upon a modern concrete post-and-beam structure. The infill of rock walls is made from the very boulders extracted from the ground during site leveling, so that the cycle of destruction and recreation may continue in permanent evolution.
Gross Area
7,350 m²

Status
Complete

Completion Date
November 2021

Duration
2018 – 2021

Address
Yansi Village, Gaoqiao Town, Emeishan, Leshan, Sichuan Province